Module 4 · Chapter 4.5
Visit a builder's completed project before buying a flat: a checklist
By Sachi Academy team · 7 min read · Last checked
Sachi's short answer
A visit to a builder's completed project shows how its buildings, common areas and maintenance hold up after people move in. Find the past projects on the K-RERA page, where Section 4(2)(b) of the RERA Act makes the builder list projects from the past five years. Then inspect the common areas and ask residents about handover and repairs.
In this lesson 5 sections
4.5.1 Why visit a builder’s completed project before you buy?
A builder’s completed project shows how its work holds up after people have lived there for some years. A show flat or a brochure shows the project on its best day. A completed project shows the lifts, the paint, the drains, the clubhouse and the maintenance after real use. It also shows how the builder handled handover and repairs, which are the parts that buyers often find hard. The RERA Act, 2016 gives you a way to choose which project to see. Section 4(2)(b) makes the promoter file a brief detail of the projects it launched in the past five years, with the K-RERA registration. These usually appear in the Promoter Details tab of the new project’s K-RERA page, though the list can be empty. A visit has limits. One old project is a small sample, and the new project can have a different contractor, team or design. Use the visit to form questions for the builder, together with the delivery record and the K-RERA filings.
| What a visit can show | What it cannot show |
|---|---|
| How finishes and common areas age | Whether the new project will finish on time |
| How the lifts, pumps and drains are kept | The new project’s structural design |
| How residents rate handover and repairs | Whether the new project uses the same contractor |
| Whether promised amenities were delivered | The new project’s funding position |
4.5.2 How do you choose which completed project to visit?
Choose the project from the K-RERA record, and check that the same company built it. Open your new project’s K-RERA page and note the promoter’s legal name in the Promoter Details tab. A brand on the brochure can cover several companies, and each project can have a different legal promoter. Then read the list of past projects in the same tab. Pick one that is completed and occupied for at least a few years, so that wear and repairs are visible. Pick one that is similar to your new project in type and height if you can. A low-rise project tells you less about a 30-floor tower. Open the old project’s own K-RERA page, if it has one, and check its promoter name and its completion date. If the sales team suggests a project, check it the same way. The sales team may suggest the builder’s best-kept project. Visit a second project too, if you can.
- Note the promoter’s legal name on your new project’s K-RERA page.
- Read the past projects in the Promoter Details tab, if the list is filled.
- Pick a completed, occupied project of a similar type and height.
- Check the old project’s promoter name and completion date on K-RERA.
- Visit a second project, if you can.
4.5.3 What should you inspect on the visit?
Inspect the shared parts of the project, where the builder’s work and the maintenance are both visible. Look at the lift lobbies and the lifts: the doors, the buttons, any out-of-order notices. Look at the walls of the corridors and staircases for damp patches, cracks and peeling paint. Look at the basement for water marks and leaks from the slab above. Look at the drains, the roads inside the project and the parking areas after rain, if you can. Check that the amenities in the old brochure exist and work: the pool, the gym, the clubhouse, the play area. Ask the security staff which areas visitors may see, and follow their rules. Do not enter plant rooms, the terrace, or any flat without permission. A visual check is not an engineer’s inspection. If you see cracks or leaks in many places, ask an independent engineer what they may mean before you book with the same builder.
| Area | What to look for |
|---|---|
| Lifts and lobbies | Working lifts, out-of-order notices, worn doors |
| Corridors and staircases | Damp patches, cracks, peeling paint |
| Basement | Water marks, leaks from the slab above |
| Roads, drains and parking | Pooled water, broken drain covers |
| Amenities | Whether each one in the old brochure exists and works |
4.5.4 What should you ask the residents?
Ask residents about handover, repairs and maintenance, because those are the parts that a show flat cannot show. Ask how long after the promised date they got possession. Ask whether all the promised amenities were ready at handover. Ask how they reported defects, and how long the builder took to fix them. The RERA Act sets a standard you can compare with. Section 14(3) covers a structural defect, or a defect in workmanship, quality or services. If you report it within five years of possession, the builder must fix it free of charge within 30 days. If the builder fails, the buyer can get compensation under the Act. Section 11(4)(a) keeps the builder’s duty for such defects even after the conveyance deed. Also ask when the residents’ association took over the common areas, and how the maintenance charge has changed. Speak to more than one household, in different towers. Do not record names or flat numbers without consent.
| Question to ask | What a good answer looks like |
|---|---|
| How late was possession? | Close to the promised date, or a clear reason and notice |
| Were the amenities ready at handover? | Yes, or a written date that the builder met |
| How long did defect repairs take? | Within 30 days, as Section 14(3) requires |
| When did the association take over? | A clear handover of common areas and records |
| How has the maintenance charge changed? | Explained increases, with accounts shared |
4.5.5 How should you use what you found?
Turn what you saw and heard into written questions for the builder of your new project. If residents said repairs were slow, ask how the builder handles defect complaints now, and ask for the process in writing. If an amenity was missing at handover, ask for the completion date of each amenity in your agreement for sale. If the basement leaked, ask about waterproofing in the new project’s specifications. Note how many people you spoke to and what you saw yourself, and keep the two apart. A complaint from one resident is a lead to check, not a verdict. Check what you can against records. The K-RERA complaint and order lists show whether buyers of the old project took the builder to K-RERA. The RERA complaint chapter explains how to search them. The builder delivery record chapter explains how to read the builder’s other projects. Then decide with all three: the visit, the records and the new project’s own filings.
- Write one question to the builder for each problem you saw or heard.
- Ask for the answers in writing, or in the agreement for sale.
- Search K-RERA complaints and orders for the old project.
- Compare with the builder’s delivery record.
Sachi reads the Promoter Details and past projects on K-RERA for Bangalore builders. To list a builder’s completed projects before you visit, Ask Sachi.
What this means for you
- Pick the project to visit from the K-RERA Promoter Details tab, not from the sales team's suggestion alone.
- Check that the old project was built by the same company that is on your new project's K-RERA page.
- Ask residents how long the builder took to fix defects. Under Section 14(3) of the RERA Act, the builder must fix defects reported within five years, within 30 days.
Try Sachi with your home shortlist →
Questions buyers ask
Should I visit a builder's completed project before booking a flat?
Yes, if you can. A completed project shows how the builder's work and the common areas look after years of use. It is one piece of evidence, and it does not prove the new project will be the same.
How do I find a builder's completed projects?
Open the new project's K-RERA page and go to the Promoter Details tab. It lists the projects that the promoter declared from the past five years, under Section 4(2)(b) of the RERA Act.
What should I ask residents of a builder's old project?
Ask how the handover went, whether the promised amenities were ready, how long defect repairs took, and when the association took over. Ask more than one household, in different towers.
How long must a builder fix defects after possession?
Section 14(3) of the RERA Act covers defects reported within five years of possession. The builder must fix them free of charge within 30 days. If not, the buyer can get compensation.
Sources
- Real Estate (Regulation and Development) Act, 2016, sections 4(2)(b), 11(4)(a) and 14(3) (PDF hosted by K-RERA) · checked
- Karnataka Real Estate Regulatory Authority, project pages: Promoter Details tab · checked
Last checked: